| Details | What is Available in this option? |
| Basic Details | Mandatory Information required for a Part.This can be Loaded Via MS- Excel |
| Engineering Details | Engg information like Engg Unit / Net Weight , Global Part No and Industry Standard Part No |
| Issue Details | Issue Setting for this Part e.g is it a Bulk Issue? |
| Stock Details | Stock Details – Is Lot / Bin Used for the Part |
| Planning Details | Default Policy of Planning for the Part |
| Purchase Details | Purchase Cell and Purchase Lead time |
| Marketing | Link between Part No and Product Code of Sales |
| Contract | Contract Details |
| Facility | Description |
| BM01 | Register Engineering Parameters |
| BM11 | Maintain Part Details |
| BM1X | Load Part Details |
| BM12 | Maintain Part Details (with Lots e.g Production Items) |
| BM13 | Maintain Part Details (Without Lot ) e.g Engineering Items |
| BM22 | Maintain Extended Description for Part e.hg Purchase Details |
| BM23 | Maintain Alternate Part Details |
| BM24 | Maintain Vendor Dependent Parts Details |
| BM25 | Maintain Drawing Details for Part e.g Drawing Location of the Part |
| BM26 | Maintain Material Policies e.g Material Groups and variance in Purchase |
| BM27 | Maintain Part Material Rates e.g Latest PO rates |